Foundation Projects
Future Projects (Details)
2024-2025 (Details)
- Build a secure computer lab
- Built and fenced a 1-acre garden with irrigation
- Built a new teacher’s latrine
- Bought a laptop for educational access
- Bought a copier for printing school materials
- Installed kitchen water pipes and wash stations
- Rebuilt 45 desks, reopened an unused classroom
- Repaired the well and water system for the school/community
- Installed a larger solar power system for the office
- Built a stronger fence around the well and solar pump
- Installed soccer goals and fixed the field
- Built a new boys’ latrine
2023 (Details)
- Classroom improvements
- New floors for several classrooms
- Indoor and outdoor painting
- Electric wiring in the classrooms
- New metal doors and new blackboards.
- Dining Area & Kitchen Upgrades
- Installation of outside vented stoves
- Floors were refinished
- Wiring was run in the walls
- The walls were repainted
- BOOST Project - approved funding for an incinerator
- Initiation of the Foundation's participation in Tanzania's national government BOOST program
2021 (Details)
- Installed water filters on spigots
- Developed a revenue-generating garden plan
- Renovated an additional classroom
2020 (Details)
- Drilled a new well
- Installed a solar-powered pump on the well (Partners with other foundations, read MORE)
- Fully renovated a classroom
- Built new desks for Kilimamojo School
2019 (Details)
- Planning the construction of a new staff latrine to provide separate facilities for teachers.
- Complete repair of the boys’ latrine. Demolition of an old, unusable latrine.
- Extension of water lines from the main tank to the latrines and dining hall
- Complete renovation of classroom STD IV B, including new floor, door, and window repairs, Interior and exterior wall repairs, and painting.
- Teacher Initiative Program
- Launched a new teacher-driven grant program allowing teachers to apply for funding for student-focused projects.
- Approved project for school drum corps instruments, requested by teacher Daniel Tsekeway.
2018 (Details)
Dining hall and kitchen repairs
- Repaired and repainted the main entry door
- Repaired and painted the side exit door
- Installed three new windows for better lighting and air circulation
- Added three large vents above the existing kitchen windows for improved smoke and heat exhaust
- Completed exterior masonry repairs, including fixing cracks and steps
- Repaired interior floor cracks
- Installed a sink for students to wash their hands, plates, and utensils
- Repaired all broken windows, hinges, and latches
- Applied washable paint to all interior surfaces and the ceiling
2017 (Details)
- Furnished the new library
- Replaced the damaged solar inverter and repaired the existing system.
- Approved additional funds to:
- Relocate the solar panels and system
- Wire the library for solar electricity and connect computers and a printer.
- Secure the inverter and batteries inside a locked, strong room with a steel security door.
- Installed ceiling boards in:
- The main library room
- The teachers’ room
- The small classroom
2015 (Details)
- Start construction of the Library/Administration Building.
- Construction of a 12-stall latrine.
2012-2013 (Details)
Completed remodeling of older classrooms
- Patched walls and ceilings
- Skimmed and sealed floors
- Replaced doors and windows
- Painted interior and exterior walls
2011 (Details)
- Built a classroom building with two classrooms
2010 (Details)
- Built a dining hall
- Built a kitchen building
- Built a water reserve tank and solar power system
2008-2009 (Details)
- Formation of Kibaoni Primary School Foundation
- Received 501(c)(3) tax status
- Installed drinking fountain
- Built girls latrine